The Fighting Scots | From Maintenance to Replacement

The College of Wooster

Making the Impossible Possible: Challenge Accepted

Timken Gym Before & After

It took 10 years.

In 2008 Farnham Equipment Company’s Maintenance Solutions Team quoted and performed the first of many seating inspections and repairs at The College of Wooster Timken Gym. Over the span of 10 years, Jim Davis would contact FEC to come back for repairs with a major overhaul in 2012 that led to the start of budget planning for a new seating system that wouldn’t come to fruition until 2017.

The existing seating was installed in the late 60’s, a unique set up with the main seating bleacher bank split/separated in two banks with the intention of creating two separate courts and gym spaces.

The freestanding reverse fold bleacher for rows 1-13 was 7’ deep by 12’h by 104’ long and separated the two gyms. Behind the freestanding reverse fold bank was the massive wall attached bank for rows 14-30 at 24’ row spacing. The bank was 8’d by 28’h by 104’l. When opened, the wall attached bank would meet up with the freestanding reverse fold to create a single bank of seating. This very large bank would take a lot of time, manpower and prayers to open and close due to the size and age of the structure.

The seating opposite the large bleacher bank was typical seating. A recessed bank 13 rows at 30” row spacing by 104’l with wood backs on the main court and another 14 Rows at 24” row spacing by 104’l freestanding reverse fold in the balcony.

May 2017, discussion began and challenges presented themselves. First was to design the largest freestanding reverse fold bleacher bank intended to divide the two gyms and match the height for the cross aisle. Hussey Seating Company would not engineer two separate bleacher banks like the existing seating and accepted the challenge to truly make this seating system work for the College of Wooster. The final design was a 22-Row system. Rows 1-14 have a custom rise (to meet the balcony door way height, with 33” row spacing, Metro and Contour seating, a 6’6” cross aisle, then rows 15-22 at 26 row spacing with CourtSide Seating, for an Open dimension of 58’7”deep, by 104’l. The top seat is at 18’2” with an over height of 22’3”. The closed dimension is 10’9”d. To help reduce weight, we designed the back panel to have a 10’ x 104’ banner above the 10’ plywood back. A local company manufactured the “FIGHTING SCOTS” banner for us.

Challenge Accepted. To date this is the largest freestanding reveres fold bleacher bank in Hussey Seating history and only takes one person a few minutes to open and set up.

Opposite the reverse fold freestanding bleacher bank we matched existing seating on the main court with a wall attached recess bank with 13-Rows of Metro Chairs and Contour backrest at 33” row spacing transitioning to the balcony to a 14-Row 26 Row spacing with CourtSide seats. Both banks at 104’ in length.

Next, Delivery. In 2010 the college built the Scot Recreation center next to the Timken Gym, closing off direct access into the gym main court level. Mike Kirk, Project Manager for Farnham had to get creative with a solution for delivery that would include a crane to lower all the main floor material into the patio/pit area emergency exits. But there wasn’t direct access there either – the delivery truck would need to park on the street with a hillside barrier to the sidewalk. Installation was phased in collaboration with the gym’s floor replacement.

Challenge Accepted. Plan in Place.

Pat Kindelin took some time to meet with Jeffrey Bricker, Scot Center Operations Manager, see below for what he has to say about the refreshing face of Timken Gymnasium.

A big Thank You to Jay Carter and Miranda Harman at Hussey Seating for all their help in designing and pricing out the new seating system. It was a complicated project with many details that needed to be worked out. Thanks to Dave Farnham for his special attention to all the details in this project that made it all come together

The overall team work at Farnham Equipment Company with Rocky Baker and the Service Department, Kami Wernimont for helping put this video together and to Mike Kirk and his team of installers made for complete team effort for a project 10 years in the making for Farnham Equipment Company.

View the full Gallery Here:

The College of Wooster | Timken Gymnasium Bleacher Replacement

Heidelberg University | Seiberling Gymnasium Bleacher Replacement

Telescopic Bleachers

Heidelberg University unveiled their newly renovated Seiberling Gymnasium on August 18, and we were lucky enough to get in for a sneak peek the day before. The University kept the renovations under lock and key (actually replacing locks!) with windows covered, in anticipation of the official unveiling on August 18th prior to the first Heidelberg volleyball practice. Students and…

University of Cincinnati | Nippert Stadium

Outdoor Stadium Seating

  The summer of 2015 included a major facelift for the University of Cincinnati’s Nippert Stadium. Hussey Seating Company and Farnham Equipment Company worked with a tight deadline to provide a complete Perma-Cap installation for the stadium, resulting in vivid Bearcat colors. The project began with a review of the seating by Hussey Seating Company and Farnham Equipment Company….

Columbus State Community College | Dublin Regional Learning Center

Wood Lab Casework

  Owner:  Columbus State Community College Architect:  Moody Nolan Contractor:  Daimler Group Sub-Contractor: Farnham Equipment Company In August 2015, Columbus State’s Dublin Regional Learning Center moved into the Integrated Education Center on Ohio University’s Dublin Campus. The building also houses Ohio University’s College of Health Sciences and Professions. The rest of the Dublin campus houses Ohio University’s Heritage College…

University of Findlay | Croy Gymnasium Bleacher Replacement

Telescopic Bleachers

  They’ve been there since the building was constructed in 1969, but in the summer of 2015, Croy Gymnasium’s bleachers were replaced as part of a plan to increase safety and modernize aesthetics. A renovation in the making for several years, Farnham Equipment Company continually checked in with the University of Findlay’s Athletic Director and, as funding became available,…

Southern State Community College | Brown County Campus

Plastic Laminate Casework/Millwork

  Facility: Southern State Community College, Brown County Campus – Mt. Orab, OH Architect: BHDP Architecture – Cincinnati, OH Construction Manager at Risk: Quandel Construction Group, Inc. – Cincinnati, OH Sub-Contractor: Farnham Equipment Company Southern State Community College broke ground at the Brown County Campus in June 2013 and welcomed students in August 2014 to start the first fall semester on the new…

Ashland University Kates Gymnasium | Sherrill Hudson Court – Ashland, OH

Telescopic Bleachers

  Ashland University’s Kates Gymnasium | Sherrill Hudson Court is a great before and after project in which Farnham Equipment Company performed both the tear out of the existing bleachers and the installation of the new Hussey Seating Company Bleachers. One side features Maxam+ Telescopic Platform Bleachers with 15 rows and a net seating capacity of 646. Metro seating with…

Mount Vernon Nazarene University | Ariel Arena – Mount Vernon, OH

Telescopic Bleachers

  Design work began six to eight years ago for the Mount Vernon Nazarene University (MVNU) Ariel Arena. Farnham Equipment Company was involved from the beginning with several different architects before the University found the right fit with SōL Harris/Day Architecture and Farnham Equipment Company for their bleacher project. Before the final selection was made, we presented previous contending…

Zane State College Advanced Science & Technical Center

Wood Casework

  Facility: Advanced Science & Technical Center – Zane State College Architect: SHP Leading Design – Columbus, OH Construction Manager: Quandel Construction Group, Inc.  – Westerville, OH Contractor: Robertson Construction Services, Inc. – Heath, OH Sub-Contractor: Farnham Equipment Company Specification Sections: #066500 Solid Polymer Fabrications #123200 Manufactured Wood Casework #123553 Laboratory Casework After breaking ground in September 2012, Zane State College is hosting their Grand Opening Ceremony…