The $65 million project to rebuild Circleville City Schools started with Circleville High School and the 1,100-student elementary school in construction a quarter-mile north. The elementary school is set to open for the 2014-2015 school year. The school district will remove the current high school and build a new middle school in its place that is set to open for the 2015-2016 school year. To keep up with the Circleville City School’s construction, be sure to check out their construction website and check back here to see the completed project!

Facility: Circleville High School – Circleville City Schools
Architect: SHP Leading Design – Columbus, OH
Construction Manager: Lend Lease – Columbus, OH
General Contractor: Monarch Construction – Cincinnati, OH
Sub-Contractor: Farnham Equipment Company
Status: In Progress

Specification Sections:
123553 Laboratory Casework
123200 Manufactured Wood Casework
123250 Music Casework
126600 Telescoping Stands
126100 Fixed Audience Seating

Circleville High School is making progress toward completion and we stopped by to check in on the project. Check back after completion for more information and updated photos.

Stevens Industries Manufactured Wood Casework includes plastic laminate faced wood cabinets, secretarial workstations, countertops and backsplashes with solid surfacing material countertops. Casework and millwork are finished in River Cherry plastic laminate with white interior and 5-knuckle Brush Nickel hinges and Bentwire Brush Nickel pulls.

Circleville High School (51) Stevens Casework Stevens Casework Stevens Casework Stevens Casework Stevens Casework Stevens Casework Stevens Casework

Stevens Industries Music Casework includes plastic laminate faced specialty casework for instrument storage in the music rooms.

Stevens Music Casework Stevens Music Casework

CampbellRhea Laboratory Casework fills six science labs at the High School in Signature II Red Oak with radiused-squared edges. Vertical grain doors and horizontal grain drawer fronts have a veneer face and back with a 3mm lumber edge band. 5-knuckle stainless steel CP-1 hinges and extruded aluminum rod design AL-2 pulls were used. Tops have a 1” black edged epoxy resin top with 4” high applied splashes. Black epoxy resin drop in sinks were used with water saver chrome service fixtures with vacuum breakers. Science labs also include Resin Pegboards, Safety Glass Monitors, Acid Storage Cabinets, Flammable Storage Cabinets, and Fume Hoods. The instructors’ demonstration desks were customized with a unique chase for technology and wire management.

CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework CampbellRhea Lab Casework

Hussey Seating Company wall attached Maxam 26 Telescopic Stands are in the main gymnasium with two banks, one with 14 rows of seating and one with 8 rows of seating. Both are Integral Power 2nd Row with Limit Switches and Motion Monitor by Hussey with CourtSide Seating and standard aisle rails. The third bank of bleachers is manual with 4 rows of seating with Self-Storing Safety End Rails and a Safety End-Closure Curtain.

Hussey Seating Company Bleachers  Hussey Seating Company Bleachers Hussey Seating Company Bleachers  Hussey Seating Company Bleachers

Hussey Seating Company Quattro Collection Traditional Seating will be installed in the auditorium with standard tablet arms and Wood Veneer Trad Soft Square end panels with ADA removable chair locations. The high school auditorium will have seating for 603. Matching Quattro Collection Traditional Fixed Seating will also be installed in the Multi-Purpose Meeting Room.

Facility: Circleville Elementary School – Circleville City Schools
Architect: SHP Leading Design – Columbus, OH
Construction Manager: Lend Lease – Columbus, OH
General Contractor: The Altman Company – Columbus, OH
Sub-Contractor: Farnham Equipment Company
Status: In Progress

Specification Sections:
123200 Manufactured Wood Casework
126600 Telescoping Stands

Circleville Elementary School, located near the new High School is in early stages of completion but we were able to get in for a sneak peak on the progress.

The two-story Elementary School will house Stevens Industries Manufactured Wood Casework similar to the High School in finished in River Cherry plastic laminate with white interior and 5-knuckle Brush Nickel hinges and Bentwire Brush Nickel pulls.

One bank of manual Hussey Seating Company wall attached Maxam 26 Telescopic Stands will be installed in the Elementary School’s main gymnasium with 3 rows of black CourtSide seating.

Stevens Casework Stevens Casework Stevens Casework Stevens Casework

 