Bleacher Maintenance: Bleacher Breakers

Preventative Bleacher Maintenance: Bleacher Breakers This portion of our Gym Safety Session videos is concerned about Bleacher Breakers, which are an important part of the telescopic bleacher system. This short video shows where they are located and how they can shut off the power to the bleacher. This can assist with diagnosing any issues a facility might have with the motors….

Westerville City Schools | Westerville South High School Renovations

Project Name: Westerville South High School Renovations Owner: Westerville City Schools Architect: Triad Architects CMR: Adena Corporation Scope: Provide and Install Educational Casework, Telescopic Bleachers and Athletic Equipment Completion Date: Winter 2020 Westerville City Schools looked to build a new competition gymnasium at Westerville South High School. This larger athletic wing assisted with modernizing the existing building.. Adena Corporation…

Bleacher Maintenance: Limit Switches

Preventative Bleacher Maintenance: Limit Switches This portion of our Gym Safety Session videos is concerned about Limit Switches, which are critical to preventative maintenance of your telescopic bleacher. This short video explains where they are located, how they can shut off the bleacher in the open position, thus preventing wear marks on your gymnasium floors and exhausting the drive wheels. This…

Brunswick Local Schools | Brunswick Middle School

Project: Brunswick Middle School Owner: Brunswick City Schools Architect: TDA Architecture CMR: Hammond Construction Scope: Provide Telescopic Bleachers, Athletic Equipment and Auditorium Seating Brunswick City Schools completed their Middle School “Blue Devils” Complex. “Dedicated to excellence”, Hammond Construction and TDA Architecture partnered to lead this project from start to finish. Along the way, Farnham Equipment Company (FEC) won contracts…