• Home
  • OUR PRODUCTS
  • OUR SERVICES
  • OUR PROJECTS
  • OUR STORY
  • CONTACT US

West Geauga Local Schools | West Geauga High School Bleacher Replacement

Published by farnhamequipmentco on May 25, 2018May 25, 2018

 

Project Name: West Geauga High School Bleacher Replacement
Owner: West Geauga Local Schools
Scope: Telescopic Seating Replacement
Contract: NJPA
Completion:
 August 2017

West Geauga High School replaced their telescopic bleachers summer of 2017 with two new Hussey Seating Maxam Telescopic Bleacher banks. They utilized the Signature Logo Program by accenting their #289 Dark Blue CourtSide Seats with “WG” block lettering in #000 White CourtSide Seats across one bank and two #000 White CourtSide Seats block lines on the other bleacher bank. Total net seats: 864.

The new bleachers feature Hussey’s Auto-Rotating Aisle Rails, ensuring that aisle rails are set up properly with the push of a button. With this option, no tools or labor is required as the rails automatically rotate to the open or closed position during operation.

Also included were Safety End Closure Curtains to prevent unauthorized access to the bleacher’s understructure, customized with their school logo. Clarin Portable Team Seating with a storage cart was included, customized with the Wolverines logo and school name.

 

West Geauga Local Schools | West Geauga High School Bleacher Replacement

Categories: BleachersProject Gallery
Tags: Auto-Rotating Aisle RailsBleacher ReplacementBleachersbleachers OhioClarin by Hussey SeatingHigh School Bleacher ReplacementNJPAOhioSafety End Closure CurtainsSignature LogoTeam SeatingTelescopic SeatingWest Geauga Local Schools

0 Comments

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *

Search
Categories
  • A Bleacher Procurement Project: Start to Finish Series (2)
  • Athletic Equipment (55)
  • Auditorium Seating (58)
  • Bleacher Safety – What's Your Risk Series (11)
  • Bleachers (202)
  • Casework (123)
  • Colleges & Universities (10)
  • FAQ's & Life Hacks: Video Series (4)
  • Gym Safety Sessions: Preventative Bleacher Maintenance (12)
  • Lab Casework & Equipment (57)
  • Maintenance Solutions: Bleachers, Grandstands, Athletic Equipment (80)
  • Michigan (10)
  • Office Furniture (2)
  • Outdoor Grandstands (50)
  • Outdoor Seating (27)
  • Project Gallery (274)
  • Safety & Code Compliance (52)
  • Sourcewell (14)
  • The Re-Purpose Project (1)
  • Uncategorized (20)
  • Vocational Shop Equipment (3)

Related Posts

Bleachers

Indian Hills High School Delivers New Bleachers With Elevated Walkway, Logos and More

End Customer: Indian Hills Exempted Village SchoolsLocation: Cincinnati, OHDate: Early 2025 Project Overview Indian Hills High School needed to replace an existing bank of bleacher seating in the gymnasium. After consulting Farnham Equipment Company (FEC) Read more…

Bleachers

Sandusky Aquatic Center Shines With New Bleachers

End Customer: Sandusky City SchoolsLocation: Sandusky, OHCompletion Date: Summer 2025 Project Overview The new Sandusky Aquatic Center was brought together through the management of Mosser Construction and designs by TDA Architecture. Having established relationships with Read more…

Casework

New Massillon West Elementary PK-3 School Showcases Custom Casework

End Customer: Massillon City SchoolsLocation: Massillon, OHCompletion Date: Summer 2025 Project Overview The new Massillon West PK-3 Elementary School project was managed by CT Taylor Construction with designs by Architectural Vision Group. Farnham Equipment Company Read more…

CONTACT US
  • Email
    marketing@farnhamequipment.com
  • Phone
    614.882.0790
  • Fax
    614.781.9603
  • Address
    930 Kingsmill Parkway
    Columbus, OH 43229
FOLLOW US
OUR TERMS

Privacy Policy | Cookie Preferences


Hestia | Developed by ThemeIsle