• Home
  • OUR PRODUCTS
  • OUR SERVICES
  • OUR PROJECTS
  • OUR STORY
  • CONTACT US

Port Clinton High School Showcases School Spirit With Brand New Bleachers

Published by farnhamequipmentco on May 22, 2024May 22, 2024

Port Clinton High School desired upgrades to its gymnasium, but didn’t have a vision of the end-result. Looking for creative ideas, the school enlisted Farnham Equipment Company to provide custom options for their new gymnasium as they looked to replace their existing gymnasium seating.

FEC delivered and installed two new banks of telescopic seating through Hussey Seating Company, netting over 1,200 seats for spectators. Complementing the school’s colors, the 10” courtside seats on the bleachers are bright red and include seat numbers and row letters. Each bank has ADA compliance through flex-row seating. This allows for wheelchair patrons to get up front at the best parts of the court, while also serving as recoverable seats in the event there are no wheelchair patrons. The school requested other features, including a semi-permanent media platform to film games, and safety end curtains to prevent students from getting in the understructure of the bleachers. 

Logos were a primary feature of these new bleachers, seen on multiple locations. Primarily, Xtreme Logos with the letters “PC” are fused to seats at the center of each bleacher bank to give a professional look to the bleachers. On the end caps of the seats, courtside graphic logos also show “PC” to reinforce the school spirit. On the safety end curtains, the phrase “We are PC!” with the school’s Indian Mascot is visible on both end curtains. Finally, the media platform has a custom design with the phrase “Port Clinton High School”. The school spared no expense to ensure that its school spirit was clear at every point of their new gymnasium upgrades, with the end product turning out fantastic.

This project was a favorite for FEC because it featured us working directly with our customer to find the right solution to their vision. Through many conversations and design options, the school opted for a heavy logo-package for their new seating and were thrilled with the end result.

The project gallery at Port Clinton High School is visible below.

IMG_7685wm
Categories: BleachersProject Gallery
Tags: BleachersHussey Seating CompanyTelescopic BleachersXtreme Logo

Search
Categories
  • A Bleacher Procurement Project: Start to Finish Series (2)
  • Athletic Equipment (56)
  • Auditorium Seating (59)
  • Bleacher Safety – What's Your Risk Series (11)
  • Bleachers (205)
  • Casework (125)
  • Colleges & Universities (10)
  • FAQ's & Life Hacks: Video Series (4)
  • Gym Safety Sessions: Preventative Bleacher Maintenance (12)
  • Lab Casework & Equipment (57)
  • Maintenance Solutions: Bleachers, Grandstands, Athletic Equipment (81)
  • Michigan (10)
  • Office Furniture (2)
  • Outdoor Grandstands (50)
  • Outdoor Seating (27)
  • Project Gallery (278)
  • Safety & Code Compliance (52)
  • Sourcewell (15)
  • The Re-Purpose Project (1)
  • Uncategorized (20)
  • Vocational Shop Equipment (3)

Related Posts

Bleachers

Architectural Considerations: How To Design Your Bleachers With Scorer’s Tables

Customers should look to have 10’ of space to accommodate scorer’s tables and should design their visitor side bleachers to make room for scorer’s tables. This may include shortening rows of bleachers to make room Read more…

Casework

Farnham Equipment Company Collaborates On West Carrollton’s New Elementary School

End Customer: West Carrollton City SchoolsLocation: West Carrollton, OHCompletion Date: Summer 2025 Project Overview West Carrollton City Schools completed construction on its new 2-4 elementary school in the summer of 2025, with collaboration between Levin Read more…

Athletic Equipment

Milford Middle School Features New Bleachers and Athletic Equipment

End Customer: Milford Exempted Village SchoolsLocation: Cincinnati, OHCompletion Date: Summer 2025 Project Overview Milford Middle School completed construction in summer 2025, with collaboration between SHP Leading Design and Conger Construction Group. Farnham Equipment Company (FEC) Read more…

CONTACT US
  • Email
    marketing@farnhamequipment.com
  • Phone
    614.882.0790
  • Fax
    614.781.9603
  • Address
    930 Kingsmill Parkway
    Columbus, OH 43229
FOLLOW US
OUR TERMS

Privacy Policy | Cookie Preferences


Hestia | Developed by ThemeIsle