For Tree of Life Church, the groundwork that laid the foundation for new worship seating began not in Ohio, but in Florida. Head Pastor Joel Urshan was traveling in Florida and stumbled upon auditorium seats from Hussey Seating Company (HSC). The design happened to be the high-quality look he had been searching for at his worship center in Cincinnati, Ohio. Upon his return, the church contacted HSC to request a specified design for new worship seating. Farnham Equipment Company (FEC) assisted from start to finish, delivering a large, high-end seating project for the church in the fall of 2022.

FEC installed and delivered 800 Quattro Designer chairs, floor mounted with die-cast aluminum stanchions. Each seat came with matching grass wood armrests and panels in Ebony, with a Graphite fabric. This gave a professional look to the chairs, along with wood veneer end panels. The worship area has 4 areas of seating, all of which give continuity and uniformity to the main stage for worship. The FEC installed and delivered this product with quick efficiency, leaving an incredible renovation project in the end.

The church expressed its appreciation for the finished product and FEC’s assistance throughout. From design assistance, to sample chairs for the customer to review, Tree of Life experienced a great deal of confidence purchasing the high-quality Hussey product, delivered and handled professionally by the FEC team.

The project gallery for the Tree of Life Church worship seating is visible below.

IMG_2699wm