End Customer: Kenton City Schools
Location: Kenton, OH
Completion Date:  Winter 2025


Project Overview

Kenton City Schools were looking to house 864 students in a new 7-12 building. After much deliberation and buy-in from the community, a bond was passed allowing for this project to move forward, with Garmann Miller Architects and Peterson Construction Company handling the design and project management of this new facility. Along the way, Farnham Equipment Company (FEC) received contract awards for multiple scopes of work, including educational casework, telescopic bleachers, and science lab casework.

This project was a great example of the multitude of scopes FEC is able to provide for large projects. FEC has worked with Garmann Miller and Peterson on multiple projects, and was thrilled to continue that partnership to help deliver quality products to Kenton City Schools. The result was a brilliant building with high-end products throughout the facility, courtesy of FEC’s impeccable project management team and installation crews.


Key Project Features

1. Educational Casework: Stevens Industries, Inc.

The project features new Stevens Advantage casework throughout the new 7-12 building at Kenton City Schools. Among the features of the casework are:

  • Natural Recon front finishes
  • Liberty Red Countertops in the receptionist area
  • 5-Knuckle Chrome hinges with bent wire pulls
  • Installed in art rooms, self-contained classrooms, and more
  • Custom millwork in receptionist areas

2. Telescopic Bleachers and Fixed Seating: Hussey Seating Company

As is the case in many school facilities, FEC delivered and installed telescopic seating and auditorium seating from Hussey Seating Company. Some of the key features of Valley View’s new seating include:

  • 3 banks of seating between two gymnasiums, with over 1300 seats for spectators
  • Nearly 750 Quattro Classic Seats in the auditorium
  • Tapered Section bleachers
  • Courtside Seats with standard 983 black finish
  • Seat numbers and row letters
  • Semi-permanent media platform

3. Athletic Equipment: Gared Performance Sports Systems

GPSS provided wall padding, backstops, and more for the new 7-12 building.

3. Science Lab Casework: ICI Scientific

Working alongside Stevens Industries, FEC delivered and installed the science lab casework to Valley View K-12. The features of this product include:

  • Epoxy resin tops and sinks
  • Natural Wood finish 
  • Fume Hood installation

Project Gallery

The full project gallery for the new 7-12 building at Kenton City Schools is visible below.

IMG_7453wm