End Customer: Lakewood Local Schools
Location: Hebron, OH
Completion Date: Summer/Fall 2026
Project Overview
Farnham Equipment Company (FEC) was approached by Lakewood Local Schools. Looking to make renovations to the existing auditorium, key personnel from the district requested that FEC visit the facility to survey, draw up a proposal, and provide a price for replacing the existing auditorium seating. With a desired turnaround of no later than summer 2026, the FEC team got to work quickly and moved forward with the district on a summer 2026 delivery for the installation and removal of the existing seating.
This project came together quickly and was handled by the FEC Sales Team from start to finish. The district was thrilled with FEC’s communication, urgency, and professionalism throughout the entirety of the project, and looks forward to showcasing the new seating ahead of the 2026 school year. All of this quick turnaround was assisted by the school working to utilize Sourcewell for its purchasing convenience.
Key Project Features
1. Fixed Audience Seating: Hussey Seating Company
The project at Lakewood High School includes new fixed seating, courtesy of Hussey Seating Company. Among the features of this new product are:
- 635 Quattro Classic chairs with seat numbers and aisle lettering
- Seat Backs to be 33″H
- Polymer Armrests
- Dimmable Aisle LIghts
- Demo of existing seating, followed by installation of new seating
Before




After
The full project gallery for the new seating at Lakewood High School is visible below.