End Customer: Field Local Schools
Location: Mogadore, OH
Date: Summer 2025
Project Overview
Field High School reached out to Farnham Equipment Company (FEC) for options to make upgrades on its existing high school home grandstands. After much deliberation and multiple options, the school opted for a scope to include a new crosswalk deck with ADA seating, a handicap ramp, a vomitory exit, and two stairs to upgrade the existing stadium bleachers.
The current walkway and handicap ramp were constructed from wood, something the district was eager to improve upon for safety and ADA compliance. FEC’s Service Department handled this project from start to finish with precision and professionalism, providing Field High School with upgrades to their stadium grandstands ahead of the 2025 season.
This project exemplified the ongoing relationship built between FEC and its customers. It was a great compliment that the work performed by the FEC service department over the past decade made the school confident in handling a large upgrade project such as this.
Key Project Features
1. Outdoor Bleacher Modifications: National Recreation Systems
The new home grandstand upgrades at Field Local Schools include:
- (1) 36” elevated platform at 10’ deep to run the entire length of home side bleachers
- (12) cut-outs for ADA seating to be located across the first row of seating, coupled with companion seats to meet code requirements
- (1) L-shaped handicap ramp
- (2) stairs located at ends of crosswalk platform
- (1) vomitory cut-out located next to center aisle for egress
- All railing and handrails for crosswalk deck, handicap ramp, and stairs to meet code compliance
- Removal and disposal of existing handicap ramp, front railing, and stairs to make room for upgrades
Before:






After: